...
首页> 外文期刊>Hydrotechnical Construction >Assembly of hydropower equipment
【24h】

Assembly of hydropower equipment

机译:水电设备组装

获取原文
获取原文并翻译 | 示例
           

摘要

Six vertical units consisting of pump-turbines (P-Ts) of type RONT-115/812-V-630 and motor-generators (M- Gs) of type VGDS 1025/245-40UkhL4 with a total capacity of 1200 MW are installed at the Zagorsk pumped-storage Station (PPS). The maximum capacity of the unit is Input in pump regime 220 MW; Output in generator regime .205 MW;In synchronous capacitor regime,180Mvar. The unit is equipped with an electrohydraulic regulator ERG-211-10-8 with an oil-pressure system OPS 20- 2/63-3 (UNITS Nos. 1 and 2) and regulator ERG-Il-150/6.3-9 with OPS 12.5/2-63-12.5-2NBU (UNITS Nos.3-6).
机译:安装了六个立式机组,这些机组由RONT-115 / 812-V-630型的水轮机(P-T)和VGDS 1025 / 245-40UkhL4型的电动发电机(MG)组成,总容量为1200 MW在Zagorsk抽水蓄能站(PPS)。机组的最大容量为220兆瓦时的输入功率;发电机状态下输出.205 MW;同步电容器状态下输出180Mvar。该装置配有带液压系统OPS 20-2-2 / 63-3(1号和2号)的电液调节器ERG-211-10-8和带OPS的调节器ERG-Il-150 / 6.3-9。 12.5 / 2-63-12.5-2NBU(单位3-6)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号