...
【24h】

ROLLER COMPACTED CONCRETE DAMS

机译:滚筒压实混凝土坝

获取原文
获取原文并翻译 | 示例
           

摘要

The dams shown in this Table are arranged according to the completion date for the RCC section of the project concerned. Only dams (completed, under construction or due to begin RCC placement in 2021) with a height ≥30 m have been included. The key to the abbreviations used in the Table is given below. All dams are of the gravity type except those marked [H-F], [A-G] and [A], which are hardfill, arch-gravity and thin arch dams, respectively. Comments or amendments to the data shown should be addressed to the author of the Table: Or M.R.H. Dunstan, Malcolm Dunstan & Associates, Hayford Hall, Buckfastleigh, Devon, TQ110JQ, UK.
机译:该表中所示的大坝根据有关项目RCC部分的完成日期来安排。 已经包括大坝(在建造或由于2021年开始的RCC放置)的大坝,已经包括高度≥30μm。 表中使用的缩写的关键如下。 除了标有[H-F],[A-G]和[A]之外,所有坝都是重力型,它们分别是硬填充,拱重和薄拱坝的那些。 所显示的数据的评论或修改应讨论表格的作者:或M.R.H. Dunstan,Malcolm Dunstan&Associates,Hayford Hall,Buckfastleigh,德文,TQ110JQ,英国。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号