Two more units come on line at Dniester, Ukraine

机译:乌克兰第聂伯河又有两个装置上线

获取原文
获取原文并翻译 | 示例
           

摘要

Two further units at the Dniester pumped-storage plant in Ukraine were connected to the grid on 24 October, at a ceremony attended by the country's President, Petro Poroshenko. The commissioning of units 3 and 4, with a combined capacity of 648 MW in the generating mode and 842 MW in the pumping mode, doubles the project's installed capacity. Poroshenko said that the construction of the plant would enhance Ukraine's energy independence, and making it less dependent on Russian gas. The two units will result in estimated annual savings of between US$ 270 and 310 million by reducing the consumption of coal, oil and gas at the country's thermal power stations, according to Igor Syrota, the Director-General of Ukrhydroener-go, the developer and state-owned operator of the country's largest hydro plants.
机译:10月24日,乌克兰总统德涅斯特抽水蓄能工厂的另外两个机组与电网连接,该国总统佩特罗·波罗申科参加了仪式。 3号和4号机组的调试,发电模式下的总装机容量为648 MW,抽水模式下的总装机容量为842 MW,使项目的装机容量翻了一番。波罗申科说,该工厂的建设将增强乌克兰的能源独立性,并减少对俄罗斯天然气的依赖。开发商Ukrhydroener-go的总干事伊戈尔·赛罗塔(Igor Syrota)表示,这两个机组将通过减少该国热电厂的煤炭,石油和天然气消耗,每年估计节省270至3.1亿美元。以及该国最大的水电厂的国有运营商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号