首页> 外文期刊>International Journal on Hydropower & Dams >SSE schedules Glendoe restart in Scotland
【24h】

SSE schedules Glendoe restart in Scotland

机译:SSE安排Glendoe在苏格兰重启

获取原文
获取原文并翻译 | 示例
           

摘要

The Glendoe plant in Scotland is to be brought back into operation by late August, following the extensive repairs to overcome a tunnel collapse, as well as extensive extra lining works, according to the owner, Scottish and Southern Energy (SSE). Glendoe will have been out of action for almost three years, having only been operational for several months before the discovery of a rockfall at a fault zone in the upper reaches of the headrace tunnel.
机译:据苏格兰和南方能源公司的所有者称,苏格兰将进行大规模维修以克服隧道坍塌,并进行了大量的额外衬砌工程,苏格兰的Glendoe工厂将在八月下旬重新投入运营。 Glendoe将停工近三年,仅在几个月前就投入使用,直到在Headrace隧道上游的断层带发现崩塌。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号