...
首页> 外文期刊>International Journal on Hydropower & Dams >Kirik dam moves to the final design stage
【24h】

Kirik dam moves to the final design stage

机译:Kirik大坝移至最终设计阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Located in the western Black Sea region, this dam is on Karasu creek which is one of the tributaries of Gokirmak river. Implementation of the project will provide irrigation for 11 553 ha within the Karasu valley and Ihsangazi plains, as well as potable water of 10 hm`3/year to Kastamonu city from the dam, which has a total reservoir volume of 42 x 10~6m~3. The concrete faced gravel fill dam is 86.5 m high from the thalweg and has a total fill volume of 3.2 x 10~6m~3. Stored water will be controlled and diverted to potable water systems, irrigation water systems, and bottom outlet systems through a branching structure which intakes water
机译:该水坝位于黑海西部地区,位于卡拉苏河上,该河是Gokirmak河的支流之一。该项目的实施将为Karasu山谷和Ihsangazi平原提供11 553公顷的灌溉,以及从水坝到Kastamonu市的10 hm`3 /年的饮用水,水库的总蓄水量为42 x 10〜6m 〜3。距thalweg高8,65 m的混凝土面板砾石坝,总填充量为3.2 x 10〜6m〜3。储存的水将受到控制,并通过取水的分支结构转移到饮用水系统,灌溉水系统和底部出口系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号