...
首页> 外文期刊>The international journal on hydropower & dams >Sopladora will add 480 MW to Ecuador's largest hydro complex
【24h】

Sopladora will add 480 MW to Ecuador's largest hydro complex

机译:Sopladora将为厄瓜多尔最大的水电枢纽增加480兆瓦

获取原文
获取原文并翻译 | 示例
           

摘要

Studies have confirmed the technical and economic feasibility of the 480 MW Sopladora scheme, whichrnwill be the next stage of the major Paute development in Ecuador. Various challenging features of the site,rndesign options which were considered and those eventually adopted, are discussed here.rnAt the end of May 2009, the Ecuadorian Electric Corporation (CELEC SA) will call for a public tender, with funding, for construction of the Sopladora hydropower plant. CELEC is the concessionary of the Integrated Paute Hydropower Complex (see Fig. 1), which comprises four projects: Mazar (163 MW), Molino (1075 MW), Sopladora (487 MW) and Cardenillo (500 MW). All are, or will be, located on the Paute river, in the southwest of Ecuador, about 100 km from Cuenca City. Basic designs ready for the call for tenders have been carried out by a consortium of consulting engineers, comprising Leme (Brazil), Caminosca (Ecuador), Coyne et Bellier (France) and MN (Chile). The designs had to take into account a number of significant technical challenges, which are described in this article.
机译:研究证实了480兆瓦Sopladora计划的技术和经济可行性,这将是厄瓜多尔主要Paute开发的下一阶段。此处讨论了该站点的各种挑战性特征,考虑的设计方案以及最终采用的设计方案。rn 2009年5月,厄瓜多尔电气公司(CELEC SA)将呼吁进行公开招标,以筹集资金建设该电站。 Sopladora水力发电厂。 CELEC是综合皮特水电综合体(见图1)的特许经营者,该综合体由四个项目组成:马扎(163兆瓦),莫利诺(1075兆瓦),索普拉多拉(487兆瓦)和卡德尼洛(500兆瓦)。所有这些都将或将位于厄瓜多尔西南部的帕特河上,距昆卡市约100公里。咨询工程师组成的联盟已经进行了准备招标的基本设计,该联盟包括Leme(巴西),Caminosca(厄瓜多尔),Coyne et Bellier(法国)和MN(智利)。设计必须考虑到许多重要的技术挑战,本文对此进行了介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号