首页> 外文期刊>Japanese railway engineering >Introduction of ATACS on the Saikyo Line
【24h】

Introduction of ATACS on the Saikyo Line

机译:在西京线引进ATACS

获取原文
获取原文并翻译 | 示例
           

摘要

JR East installed Advanced Train Administration and Communications System (ATACS), train control system based on a radio communication, on the Senseki Line on October 10, 2011. The system has been in operation with good results since then, thus JR East has decided to introduce it on the metropolitan Saikyo Line. Although this is the second case for ATACS, its launching on the metropolitan core networks is intended to be an opening for a next generation transportation system. This paper focuses on the overview of the Saikyo Line ATACS and its difference from the Senseki Line ATACS.
机译:JR East于2011年10月10日在Senseki线上安装了先进的列车管理和通信系统(ATACS),这是一种基于无线电通信的列车控制系统。此系统自那时以来一直运行良好,因此JR East决定采取以下措施:在大都市西京线介绍它。尽管这是ATACS的第二种情况,但它在大城市核心网络上的启动旨在为下一代运输系统提供便利。本文着重介绍Saikyo Line ATACS的概述及其与Senseki Line ATACS的区别。

著录项

  • 来源
    《Japanese railway engineering》 |2014年第4期|11-13|共3页
  • 作者

    Ichiro INADA;

  • 作者单位

    Electrical & Signal Network System Department East Japan Railway Company;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号