APPLICATION OF FUZZY FAULT TREE ANALYSIS TO IDENTIFY FACTORS INFLUENCING CONSTRUCTION LABOR PRODUCTIVITY: A HIGH-RISE BUILDING CASE STUDY

机译:模糊故障树分析在确定影响劳动生产率的因素中的应用:高层建筑案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

The aim of this research is to develop a systematic approach to identify and prioritize the most influencing factors on labor productivity in a construction project, with respect to their interrelations, and also investigate different scenarios which can affect it. In the first step, factors influencing construction labor productivity were identified through reviewing previous researches. Applying a group of experts, the most important factors were then determined using their relative importance index in the second step. In the third step, the interrelations among factors were determined through several sessions and interviewing those experts. Finally, the efficiency of the proposed methodology is proved by implementing in a real high rise building construction project. In this step, the selected factors from previous steps were used subsequently for analyzing their impact on labor productivity through fuzzy fault tree analysis. The probability of occurrence of events was determined according to the opinions of four members of the project management team who involved in that project. The most critical causes were also identified using importance analysis. It is believed that using the proposed methodology, appropriate response strategies could be adopted against the identified critical events to enhance the overall productivity of a construction project.
机译:这项研究的目的是开发一种系统的方法,以识别和优先考虑对建设项目中劳动生产率影响最大的因素之间的相互关系,并研究可能影响该因素的不同情况。第一步,通过回顾先前的研究来确定影响建筑工人生产率的因素。在第二步中,使用一组专家,使用相对重要性指数确定了最重要的因素。在第三步中,因素因素之间的相互关系是通过几次会议并采访这些专家来确定的。最后,通过在一个实际的高层建筑施工项目中实施,证明了所提出方法的效率。在此步骤中,先前步骤中选择的因素随后用于通过模糊故障树分析来分析它们对劳动生产率的影响。事件发生的可能性是根据参与该项目的项目管理团队的四名成员的意见确定的。还使用重要性分析确定了最关键的原因。人们认为,使用所提出的方法,可以针对确定的关键事件采取适当的应对策略,以提高建设项目的整体生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号