...
首页> 外文期刊>The Journal of the Textile Institute. 1, Fibre Science and Textile Technology >Production scheduling in a knitted fabric dyeing and finishing process
【24h】

Production scheduling in a knitted fabric dyeing and finishing process

机译:针织物染色和后整理过程中的生产计划

获取原文
获取原文并翻译 | 示例
           

摘要

Developing detailed production schedules for dyeing and finishing operations is a very difficult task that has received relatively little attention in the literature. In this paper, a scheduling procedure is presented for a knitted fabric dyeing and finishing plant that is essentially a flexible job shop with sequence-dependent setups. An existing job shop scheduling algorithm is modified to take into account the complexities of the case plant. The resulting approach based on family scheduling is tested on problems generated with case plant characteristics.
机译:为染色和后整理操作制定详细的生产计划是一项非常困难的任务,在文献中很少受到关注。在本文中,提出了一种用于针织染整厂的调度程序,该程序本质上是具有序列相关设置的灵活的车间。修改了现有的作业车间调度算法,以考虑案例工厂的复杂性。基于家庭计划的结果方法将针对案例工厂特性所产生的问题进行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号