1. In January 2009, EADS delivered the first batch of 5,000 transmit/receive (T/R) modules for the MEADS Multifunction Fire Control Radarrn2. Critical Design Review, originally scheduled for 2009, is now slated for 2010rn3. MEADS Program currently in the midst of a nine-year design and development phase.
展开▼