...
首页> 外文期刊>Land and water >Knapps Creek Demonstration Project
【24h】

Knapps Creek Demonstration Project

机译:纳普斯溪示范项目

获取原文
获取原文并翻译 | 示例
           

摘要

So far, the project has been a success. Site 24 has provided a starting point to build upon and to increase the knowledge base of the natural stream restoration process. This is the first of many potential restoration projects along Knapps Creek and in other locations in West Virginia. Construction of the next Knapps Creek project site is scheduled for the summer of 2005. A third site is in the preliminary design stages. Using thorough documentation of the complete natural stream-channel design process, we are hoping to learn many things from this and future projects. Since natural design techniques are in their infancy compared to traditional structural approaches to stream channel stabilization, we are excited to see how they will perform over time.
机译:到目前为止,该项目已经成功。站点24提供了一个起点,可以建立并增加自然流恢复过程的知识基础。这是沿着纳普斯溪和西弗吉尼亚州其他地区的许多潜在修复项目中的第一个。下一个Knapps Creek项目场址计划于2005年夏季进行建设。第三个场址处于初步设计阶段。通过使用完整的自然流通道设计过程的详尽文档,我们希望从本项目以及将来的项目中学到很多东西。由于自然设计技术与传统的结构方法相比,还处于起步阶段,因此我们很高兴看到它们随着时间的流逝将如何发挥作用。

著录项

  • 来源
    《Land and water》 |2005年第3期|p.6-12|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 农业科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号