首页> 外文期刊>Offshore Engineer >Deck space shortage no barrier to deepwater pile installation
【24h】

Deck space shortage no barrier to deepwater pile installation

机译:甲板空间不足无深水桩安装障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Late last year, the driven-pile anchors for Murphy Oil's Kikeh spar, now stationed 120km off the coast of eastern Malaysia, were installed by Technip using an underwater hammer provided by one of the longest-established engineering companies in the offshore industry, Germany's Menck. Actually, as Bill Clewes reports, Technip's choice of equipment was reasonably straightforward, as Hamburg-based Menck remains the only company supplying hammer systems capable of being used routinely at depths like those found in the Kikeh field - in excess of 1300m.
机译:去年底,墨菲石油公司的Kikeh晶石的打桩锚已在马来西亚东部沿海120公里处停泊,由Technip使用水下锤子安装,该锤子是海上行业中历史最悠久的工程公司之一,德国的Menck提供。实际上,正如Bill Clewes所报告的那样,Technip的设备选择相当简单,因为总部位于汉堡的Menck仍然是唯一一家能够像Kikeh油田那样深度超过1300m的深度常规使用锤子系统的公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号