The power supply for Virginia's densely populated Middle Peninsula area on the Chesapeake Bay is adequate but somewhat fragile - a single 115-kilovolt (kV) line extends southward from the Harmony Village Substation of Dominion Virginia Power (DVP). The non-redundant power supply was at risk for long interruptions and local demand threatened to outstrip supply. Accordingly, in 2010, DVP obtained approvals to serve the region with a new, 230 kV power line, extending from its Yorktown Power Station. But approvals are one thing, and actual achievement is another. Installing the line was a significant technical challenge.
机译:切萨皮克湾弗吉尼亚州人口稠密的中部半岛地区的电源充足,但有些脆弱-一条115千伏(kV)的线路从Dominion Virginia Power(DVP)的和谐村变电站向南延伸。非冗余电源面临长时间中断的风险,本地需求有可能超出供应。因此,DVP在2010年获得了批准,从其约克镇电站延伸出来的一条新的230 kV电力线为该地区提供服务。但是,批准是一回事,而实际成就是另一回事。安装生产线是一项重大的技术挑战。

著录项

  • 来源
    《Pipeline & gas journal》 |2014年第1期|71-74|共4页
  • 作者

    Angus W. Stocking;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号