...
首页> 外文期刊>Underground Construction >Two Platforms, Two Shore Approaches, Two Lines And A Hurricane
【24h】

Two Platforms, Two Shore Approaches, Two Lines And A Hurricane

机译:两个平台,两个岸上进场,两条线和一场飓风

获取原文
获取原文并翻译 | 示例
           

摘要

The power supply for Virginia's densely populated Middle Peninsula-Area, on the Chesapeake Bay, is currently adequate but somewhat fragile; a single 115 kV line extends southward from the Harmony Village Substation of Dominion Virginia Power (DVP). The non-redundant power supply was at risk for long interruptions and local demand threatened to outstrip supply.
机译:目前,切萨皮克湾的弗吉尼亚人口稠密的中半岛地区的电力供应充足,但有些脆弱。一条115 kV线路从Dominion Virginia Power(DVP)的Harmony Village变电站向南延伸。非冗余电源面临长时间中断的风险,本地需求有可能超出供应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号