...
首页> 外文期刊>Pipeline & gas journal >Utilities Preparing For Advanced Metering Infrastructure
【24h】

Utilities Preparing For Advanced Metering Infrastructure

机译:实用程序为高级计量基础设施做准备

获取原文
获取原文并翻译 | 示例
           

摘要

Advanced Metering Infrastructure (AMI) is becoming a reality sooner than many energy utilities expected even though it is not a new concept. AMI takes Automated Meter Reading (AMR) to a new level. Going beyond AMR's ability to gather residential consumption and billing data remotely from a vehicle, AMI employs network communications to gather real-time data about usage patterns and then transmits the data to a host computer for further processing and analysis. As is the case with many technologies, AMI is building on its own momentum, fueled much of the time by external forces. Why is AMI suddenly a hot topic? This article takes a high-level look at the major factors contributing to the deployment of AMI, including the Energy Policy Act of 2005, maturing technology and financial incentives.
机译:尽管这不是一个新概念,但高级计量基础架构(AMI)的实现要比许多能源公用事业公司预期的要早。 AMI将自动抄表(AMR)提升到一个新水平。 AMI超越了AMR从车辆远程收集住宅消费和计费数据的能力,它利用网络通信收集有关使用模式的实时数据,然后将数据传输到主机进行进一步处理和分析。与许多技术一样,AMI在很多时候都受到外力的推动而不断发展。为什么AMI突然成为热门话题?本文从高角度探讨了导致AMI部署的主要因素,包括2005年的《能源政策法案》,成熟的技术和经济激励措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号