...
首页> 外文期刊>Platts Energy Trader >Experts split over reserve product designs as FERC examines electric market reforms
【24h】

Experts split over reserve product designs as FERC examines electric market reforms

机译:专家们将储备产品设计分开,因为FERC审查了电力市场改革

获取原文
获取原文并翻译 | 示例
           

摘要

Electric reserve costs need to be justifiable for ratepayers as US gridoperators consider reserve product designs to ensure they haveenough supply to meet demand, experts warned Sept. 14.The Federal Energy Regulatory Commission is examining potentialreforms to the energy and ancillary services markets as electric reliability continues to be a hot topic following recent major outages.Regional transmission organizations and independent systemoperators have turned to an operating reserve demand curve (ORDC)that raises operating reserve prices in times of high demand and lowreserves.
机译:电气储备费用需要对美国网格的速率Payers合理 运营商考虑预备产品设计,以确保他们拥有 专家警告9月14日,专家们提供足够的供应。 联邦能源监管委员会正在检查潜力 近期主要停电后,对能源和辅助服务市场的改革继续成为一个热门话题。 区域传输组织和独立系统 运营商已转向操作储备需求曲线(ORDC) 在高需求和低的时候提高了经营储备价格 储备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号