首页> 外文期刊>Power UK >Grid Warns Of Extra Costs Of Renewables And Lcpd
【24h】

Grid Warns Of Extra Costs Of Renewables And Lcpd

机译:网格警告可再生能源和Lcpd的额外成本

获取原文
获取原文并翻译 | 示例
           

摘要

National Grid (NG) has warned that the extra costs of coping with more wind farms on the transmission system and the implementation of the Large Combustion Plant Directive (LCPD) could substantially increase transmission constraint costs. Ofgem has asked NG to put forward proposals for next year's incentive scheme to keep down the costs of running the transmission system. NG says that underlying forecast costs for next year are more or less the same as this year ie £400 million. However, it says that the demands of extra wind power and the LCPD are going to increase additional costs from £57 million to £130 million.
机译:国家电网(NG)警告说,在输电系统上应对更多风电场的额外成本以及实施大型燃烧厂指令(LCPD)可能会大大增加输电约束成本。 Ofgem已要求NG为明年的激励计划提出建议,以降低运行传输系统的成本。 NG说,明年的基本预测成本与今年基本相同,即4亿英镑。但是,它表示,对额外风力发电和LCPD的需求将使额外成本从5700万英镑增加到1.3亿英镑。

著录项

  • 来源
    《Power UK》 |2007年第166期|p.28-29|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号