首页> 外文期刊>Proceedings of the Institution of Civil Engineers. Municipal Engineer >Measuring success in post-conflict infrastructure development
【24h】

Measuring success in post-conflict infrastructure development

机译:衡量冲突后基础设施发展的成功

获取原文
获取原文并翻译 | 示例
       

摘要

Infrastructure reconstruction and development facilitates the transition of post-conflict economies to socio-economic stability and financial normalcy. The current system of measuring success is output-based and not a reliable indicator of outcome. Furthermore, standardised output metrics are easily and often abused. However, the outcome of any infrastructure project is by definition retrospective. The post-conflict context makes this particularly complicated. A direct retrospective measure of outcome is impractical, yet any situation-specific outcome-based metric must be current and relevant during construction to be practicable. Causal-chain-derived indicators of likely outcome provide a more relevant metric; the more indicators that point to a common outcome, the greater the confidence of that outcome being realised. This paper discusses an outcome-based causal chain approach to identifying indicator metrics.
机译:基础设施重建和发展有助于冲突后经济转型到社会经济稳定和金融正态度。当前测量成功系统是基于输出的,而不是可靠的结果指标。此外,标准化的输出指标很容易且经常被滥用。但是,任何基础设施项目的结果都是根据定义回顾。冲突后的上下文使这种特别复杂化。直接回顾性的结果是不切实际的,然而,必须在施工期间的基于情况和基于情况的基于情况的基于现状的度量是可行的。可能结果的因果链衍生的指标提供了更相关的公制;指出常见结果的指标越多,该结果的置信度就越大。本文讨论了识别指标指标的基于结果的因果因子方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号