首页> 外文期刊>Pulp & Paper Canada >Strategic approach to co-generation design
【24h】

Strategic approach to co-generation design

机译:热电联产设计的战略方法

获取原文
获取原文并翻译 | 示例
           

摘要

When considering the installation of a co-generation facility in a Kraft pulp mill, it is important that one first perform a mill energy efficiency study and set tactical targets with regard to energy projects/opportunities prior to specifying the co-generation plant design specifications. For the best case, the Simple Payback Period is reduced from 5.4 to 2.5 years when energy consumption is reduced before installing co-generation. Also, on-site GHG emissions can be reduced if such an energy efficiency study is performed before installing co-generation.%Lorsqu'on envisage d'installer une centrale de cogénération dans une usine de pâte kraft, il est important de procéder d'abord à une étude de l'efficacité énergétique de l'usine et d'établir des objectifs stratégiques en ce qui concerne les projets et les occasions de développement énergétique avant de définir les spécifications pour la conception de la centrale. Dans le meilleur des cas, la période de récupération simple passe de 5,4 à 2,5 ans lorsqu'on réduit la consommation d'énergie avant d'installer la cogénération. Aussi, les émissions locales de gaz à effet de serre peuvent être réduites si l'on effectue une étude pertinente de l'efficacité énergétique avant d'installer la cogénération.
机译:在考虑在牛皮纸制浆厂中安装热电联产设施时,重要的是,在指定热电联产厂的设计规范之前,首先进行工厂的能效研究并针对能源项目/机会设定战术目标。最好的情况是,在安装热电联产之前降低了能耗,将简单投资回收期从5.4年缩短到2.5年。此外,如果在安装热电联产之前进行了这样的能效研究,则可以减少现场的温室气体排放。%当考虑在牛皮纸浆工厂安装热电联产厂时,重要的是首先,在定义工厂设计规范之前,研究工厂的能源效率并为能源开发项目和机会建立战略目标。理想情况下,如果在安装热电联产之前降低了能耗,则简单的投资回收期将从5.4年减少到2.5年。此外,如果在安装热电联产之前进行了相关的能效研究,则可以减少当地的温室气体排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号