...
首页> 外文期刊>Thermal engineering >Topping the 300-MW Power Unit at the GRES-24 District Power Station with a GTE-110 Gas Turbine Unit. Technical Solutions on the Thermal Circuit
【24h】

Topping the 300-MW Power Unit at the GRES-24 District Power Station with a GTE-110 Gas Turbine Unit. Technical Solutions on the Thermal Circuit

机译:使用GTE-110燃气轮机在GRES-24地区电站的300兆瓦发电装置中拔得头筹。热回路技术解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

We describe the outcomes from the development of a gas-turbine topping for the 300-MW power unit that was initially constructed as an attachment to an MHD-generator, which, however, has not been constructed. A 110-MWGTE-110 gas-turbine unit was used as a topping for this power unit. The topped power unit allows more than 9% of fuel to be saved as compared with the original one.
机译:我们描述了为300 MW机组开发的燃气轮机顶部的结果,该机组最初是作为MHD发电机的附件而建造的,但尚未建造。 110 MWGTE-110燃气轮机装置被用作该动力装置的顶部。最高的动力装置与原来相比节省了9%以上的燃料。

著录项

  • 来源
    《Thermal engineering》 |2010年第2期|p.129-137|共9页
  • 作者单位

    All-Russia Thermal Engineering Institute, ul. Avtozavodskaya 14/23, Moscow, 115280 Russia;

    rnAll-Russia Thermal Engineering Institute, ul. Avtozavodskaya 14/23, Moscow, 115280 Russia;

    rnAll-Russia Thermal Engineering Institute, ul. Avtozavodskaya 14/23, Moscow, 115280 Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号