...
首页> 外文期刊>Underground Construction >Manassas' Water Transmission Line Upgrades In Progress
【24h】

Manassas' Water Transmission Line Upgrades In Progress

机译:马纳萨斯输水线的升级正在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

As part of the city of Manassas Capital Improvement Program, Manassas' water transmission main line has been slated for an upgrade, replacing the 24-inch water transmission main line with a 36-inch main line. The current 45-year old water main line has served the city well, but now that the line is approaching its useful life, it is being replaced with a water main line to supply the higher-demand for water, especially in the summer months, as well as improve overall system performance.
机译:作为马纳萨斯市资本改善计划的一部分,马纳萨斯的输水干线已计划进行升级,用36英寸主干线代替24英寸输水干线。目前已有45年历史的自来水干线已经为城市提供了良好的服务,但由于该管道即将达到其使用寿命,因此将其替换为自来水干线,以满足对水的更高需求,特别是在夏季,以及提高整体系统性能。

著录项

  • 来源
    《Underground Construction》 |2015年第3期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号