Pipeline project joins welding, construction in massive effort/Outcome depends on aligning, welding, testing procedures

机译:管道项目大量投入焊接,建设/结果取决于对准,焊接,测试程序

获取原文
获取原文并翻译 | 示例
           

摘要

As roaring yellow machines lower 36-inch-diameter pipeline into a deep, muddy trench, a casual observer might think there is little to it-just swing, drop, and cover it up. Think again. In fact, so much is going on with the new Guardian Pipeline project (www.guardianpipeline.com), which is owned equally by CMS Energy, WICOR, and Viking Gas Transmission, that it takes more than 700 fulltime crew members working on various stages of the project just to keep things going. With all the digging and tunneling and grading and earth-moving and heavy lifting going on, it all appears to be rough work without much attention paid to tight tolerances. But some of the most important work on the project is the most delicate-the welding and prep of the pipeline itself.
机译:当咆哮的黄色机器将36英寸直径的管道降低成一条深沉的泥泞沟渠时,随便的观察者可能会认为几乎没有什么可做的—只是摆动,掉落和掩盖。再想一想。实际上,新的Guardian Pipeline项目(www.guardianpipeline.com)进行了很多工作,该项目由CMS Energy,WICOR和Viking Gas Transmission平等拥有,需要700多名全职工作人员在各个阶段进行工作该项目只是为了保持进展。随着所有的挖掘,隧道,平地,土方工程和重物搬运的进行,这似乎是艰巨的工作,而没有过多地关注严格的公差。但是,项目中最重要的一些工作是最精致的-管道本身的焊接和准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号