...
首页> 外文期刊>World of mining-surface & underground >BP abandones plans to build a CCS plant in Australia
【24h】

BP abandones plans to build a CCS plant in Australia

机译:BP放弃了在澳大利亚建立CCS工厂的计划

获取原文
获取原文并翻译 | 示例
           

摘要

BP has abandoned plans to build a pio-neering plant to capture and store carbon dioxide in Australia. It is the second such project the oil group has axed, and the Australian plant was part of a Joint venture with Rio Tinto, called Hydrogen Energy. The companies had wanted to build a coal-fired power plant and store the result-ing carbon dioxide Underground nearby, in a saline aquifer.
机译:BP放弃了在澳大利亚建设集石油开发工厂以捕获和储存二氧化碳的计划。这是该石油集团已取消的第二个此类项目,而该澳大利亚工厂是与力拓合资的合资企业的一部分,该合资企业名为“氢能”。两家公司曾想建造一座燃煤发电厂,并将产生的二氧化碳地下储存在一个盐水层中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号