...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Limitations in accepting localized conditioning recoverable resource estimates for medium-term, long-term, and feasibility-stage mining projects, particularly for sections of an ore deposit
【24h】

Limitations in accepting localized conditioning recoverable resource estimates for medium-term, long-term, and feasibility-stage mining projects, particularly for sections of an ore deposit

机译:对于中期,长期和可行性阶段的采矿项目(尤其是矿床段)接受局部条件可采资源估算的限制

获取原文
获取原文并翻译 | 示例
           

摘要

A localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area on a hydrothermal gold deposit The results were then compared with the corresponding 8 m × 5 m grid grade-control data in order to determine the efficiency of the approach and the validity of the recoverable resource estimates for mine planning and financial forecasts.
机译:使用典型可行性或新的采矿钻探数据配置(从大型数据库中提取热液金矿开采区的局部非线性非线性可采资源估算技术),然后将结果与相应的8 m×5 m网格等级进行比较-控制数据,以确定方法的效率以及矿山规划和财务预测的可回收资源估算的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号