...
【24h】

Land acquisition issues delay two projects in India

机译:征地问题延误印度两个项目

获取原文
获取原文并翻译 | 示例
           

摘要

Indian state-owned Indian Oil Corp.'s(IOCL)planned expansion of its 300K-b/d refinery in Paradip has been delayed due to problems with land acquisition.The expansion,which will include a 1.2MM-mt/y purified terephfhalic acid,a 108K-mt/y polyester staple fiber plant,dual-feed cracker,naphtha-based cracker,and petroleum coke gasification plant,is intended to provide feed to a proposed PC complex.IOCL had already a commissioned a 680K-mt/y propylene plant in Feb.and has awarded construction contracts for a 180K-mt/y ethylene recovery unit and 357K mt/y monoethylene glycol plant to construction company L&T Hydrocarbon Engineering.
机译:印度国有的印度石油公司的(IOCL)计划扩大其300k-B / D炼油厂在帕拉德由于土地征收问题而延迟。扩张,这将包括1.2mm-mt / y纯化的田间耳鼻喉科 酸,108k-mt / y涤纶短纤维纤维厂,双饲料饼干,石脑油基饼干和石油焦化厂,旨在为提出的PC综合体提供饲料.IOCL已经被委托了680k-mt / Y丙烯工厂于2月份授予180K-MT / Y乙烯回收单元和357kmt / Y单乙二醇厂的施工合同,以建设L&T碳氢化合物工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号