...
首页> 外文期刊>AACE International Transactions >Using Complexity Footprints to Manage Complexity in Construction Projects
【24h】

Using Complexity Footprints to Manage Complexity in Construction Projects

机译:使用复杂性足迹管理建筑项目中的复杂性

获取原文
获取原文并翻译 | 示例
           

摘要

In order to manage complexity in construction projects, construction engineers need a framework for measuring, visualizing, and tracking complexity, much like they do for scope and schedule. An innovative method to quantify complexity in construction projects is to rank five dimensions of project management (cost, schedule, technical, finance and context) in order of complexity and assign a numerical value on a scale of 0 to 100 points against a standard of 50 points for a routine project. Thus, index numbers greater than 50 indicate that the rated factor was more complex than normal. The results are then graphed in the form of a radar diagram that ultimately displays the "complexity footprint" for a project. The process of developing a complexity footprint is best explained through a case study example. This paper presents the steps and thought process used to determine the complexity footprint of the I-75 and I-94 highway rehabilitation and expansion projects in the metropolitan Detroit area of Michigan.
机译:为了管理建筑项目中的复杂性,建筑工程师需要一个框架来测量,可视化和跟踪复杂性,就像他们对范围和进度表所做的一样。一种量化建筑项目复杂性的创新方法是按复杂性顺序对项目管理的五个维度(成本,进度,技术,财务和环境)进行排名,并以0到100点的比例(50分的标准)分配数值例行项目的要点。因此,指数大于50表示额定因子比正常因子复杂。然后将结果以雷达图的形式绘制成图形,最终显示项目的“复杂足迹”。通过案例研究示例可以最好地说明开发复杂性足迹的过程。本文介绍了用于确定密歇根州底特律市区I-75和I-94公路修复和扩建项目的复杂足迹的步骤和思考过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号