首页> 外文期刊>AACE International Transactions >Mitigating Cost and Schedule Risks on Power Generation Construction Projects
【24h】

Mitigating Cost and Schedule Risks on Power Generation Construction Projects

机译:降低发电建设项目的成本和进度风险

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of power generation facilities is challenging and unique. As governments and businesses look to expand power generation facilities, meeting schedule and cost goals given the small amount of qualified resources available will be an increasing challenge. As a result, construction professionals have to be apprised of the increasing challenges faced by contractors, subcontractors and suppliers in constructing alternative energy projects. Ideally, the bid price and schedule should account for the special needs contractors and suppliers may encounter on power projects regarding quality, submittals, scheduling and coordination, procurement, transportation, change orders, delays and disruptions, unforeseen conditions, nonconforming construction documents and material/equipment fabrication. This article provides considerations for what contractors and suppliers need to consider when preparing and negotiating costs, schedules and contracts for working on power generation construction projects.
机译:发电设施的建设具有挑战性和独特性。随着政府和企业寻求扩展发电设备,鉴于少量合格的可用资源,满足进度和成本目标将成为日益严峻的挑战。结果,必须告知建筑专业人士承包商,分包商和供应商在建设替代能源项目中面临的日益严峻的挑战。理想情况下,投标价格和时间表应考虑到承包商和供应商在电力项目上可能遇到的与质量,提交,时间表和协调,采购,运输,变更单,延误和中断,不可预见的条件,不合格的施工文件和材料/设备制造。本文为承包商和供应商在准备和谈判发电建设项目的成本,时间表和合同时需要考虑的事项提供了考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号