Maintaining Definable Labor Rates for Deterministic Estimates

机译:保持可确定的人工率以进行确定性估计

获取原文
获取原文并翻译 | 示例
           

摘要

When developing estimates from higher level definition documents whether for control budgets, construction bids, or as a capital expenditure check during detailed engineering maturation, it is important to maintain well defined labor rates used in the organization of such estimates. Of the many variables and constituent values compiled for the realization of a reliable upper class estimate such as empirical data and historical factored data solicitation of firm and/or soft quotes from vendors and subcontractors, none seem to be more vague or misrepresented than labor costs, both direct and indirect. Of all the variables and elements of a comprehensive project estimate, however, total labor costs should be the most understood and definable by the cost management team. This article addresses the complexities of the many variables associated with labor costs such as inclusions, exclusions, labor burden, work-week basis by craft and labor contract stipulations which are project specific constants essential in knowing how to maintain better defined labor costs.
机译:在从更高级别的定义文档中开发估算值时,无论是用于控制预算,施工招标,还是在详细的工程成熟期间作为资本支出检查,重要的是要保持组织清楚的劳动力成本。在为实现可靠的上层阶级估算而编译的许多变量和构成价值中,例如经验数据和历史因数数据,对供应商和分包商的公司报价和/或软报价进行征集,似乎没有比劳动力成本更模糊或陈述错误的内容了,无论是直接还是间接。但是,在全面项目估算的所有变量和要素中,总人工成本应该是成本管理团队最能理解和定义的。本文讨论了与人工成本相关的许多变量的复杂性,例如,包括,排除,人工负担,按工艺和劳动合同规定制定的工作周基准,这是特定于项目的常数,对于了解如何保持更好的人工成本至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号