首页>
外文期刊>Process & Plant Engineering
>Iconic bridge project connecting Hong Kong to Zhuhai and Macau adopts BIM methodology, reducing construction costs by 12%
【24h】
Iconic bridge project connecting Hong Kong to Zhuhai and Macau adopts BIM methodology, reducing construction costs by 12%
The Leighton-Chun Wo joint venture standardized on a BIM methodology to drive consistency on this large multi-discipline design project that will connect Hong Kong, Macau, and Zhuhai. This revolutionary project includes 50 kilometers of bridges and tunnels and will create a distinctive entry point to Hong Kong. Leighton Asia conducted the civil, electrical, mechanical, structural, subsurface, and building work as the lead contractor for this ambitious project.
展开▼