Developing a mining plan for restarting the operation at Uis mine

机译:开发矿业计划,以便在UIS矿区重新启动操作

获取原文
获取原文并翻译 | 示例
           

摘要

Aftilin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing plant for phase 1 of the Uis tin project, which is scheduled to commence in the last quarter of 2018. A mining plan is required for phase 1 to supply the new pilot processing plant with 500 kt of run-of-mine ore per annum, for a period of 5 years. New geological mapping and three-dimensional modelling of the mining area were utilized to identify the most optimal mining locations that require low initial waste stripping. An open-pit mining method was selected to target the surface outcrops of the pegmatite orebodies. The mine design criteria were determined and used as input to generate the mine design by utilizing professional engineering software. The mine design was optimized and an overall stripping ratio of 0.81 was achieved. A 5-year production schedule was developed for the mine design according to quarterly periods of three months. A fixed production target of 125 kt of ore was assigned to the quarterly periods, and a ramp-up production target of 65 kt of ore was assigned for the first period. The mobile mining equipment requirements were calculated, and recommendations were made for implementing the 5-year mining plan.
机译:Aftilin矿业有限计划重新打开纳米比亚的UIS锡矿,并建立了UIS TIN项目第1阶段的试点加工厂,该工厂计划在2018年的最后一季开始。阶段1供应矿业计划新的试点加工厂,每年500千克矿石矿石,为期5年。利用新的地质映射和矿区的三维建模,以确定需要低初始废物剥离的最佳采矿位置。选择露天坑挖掘方法以靶向Pegmatite矿石的表面露头。确定矿山设计标准并用作输入以通过利用专业工程软件来生成矿井设计。优化矿井设计,实现了0.81的整体汽提比。根据三个月的季度为矿井设计制定了5年的生产计划。将125 kt矿石的固定生产靶标分配给季度期间,第一个期间分配了65 kt矿石的增速产量目标。计算移动采矿设备的要求,并为实施5年矿业计划进行建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号