Reviewing Resource Leveled Schedules Using P6

机译:使用P6查看资源级别的时间表

获取原文
获取原文并翻译 | 示例
           

摘要

Standard CPM schedule review techniques are insufficient to review automatically resource leveled schedules. When faced with the task of reviewing resource leveling, most reviewers try to pretend that it does not exist and ignore this facet of the schedule submittal. This paper provides a guide to effective review of resource leveling that can be used on construction projects utilizing an Oracle/Primavera P6 Professional? CPM schedule. This paper also discusses a large number of issues and guidelines to be considered when evaluating an automatically resource leveled CPM schedule. Beginning with issues such as how to identify if resource leveling has been used, this paper delves into the analysis of the root causes of resource delay and techniques for separating reality from error. Causes for rejection of a resource leveling procedure are covered. Methods for validating how well the plan was executed are explained. Using these procedures, the reviewer can potentially know more about the resource leveled schedule than the person who submitted it.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号