【24h】

Kazakhstan plans to pump 2.155MM b/d by 2025

机译:哈萨克斯坦计划到2025年泵2.155毫米b / d

获取原文
获取原文并翻译 | 示例
           

摘要

Development of the Caspian Sea's Kashagan field and expansion of Tengiz operations will be the keys to raising domestic crude and condensate output 24.5 from 2017's 1.731MM b/d. Last year's production was 10.5 higher than 2016's, largely thanks to Kashagan ramping up to around 250K b/d by the end of the year. Tengiz output was just over 562K b/d last year, but Chevron is expected to push it past 822K b/d by 2022. Lukoil-already active in Russian Caspian fields-has expressed interest in 2 Kazakh blocks in the Caspian Sea. The company is also participating in two joint Caspian projects between Russia and Kazakhstan, but legislative drawbacks have caused multi-year delays for them.
机译:里海的Kashagan油田的发展和扩大Tengiz油田操作将是提高国内原油和凝析油的关键输出24.5%从2017年的1.731毫米b / d。生产比2016年高10.5%,很大程度上感谢卡沙干增加至约250 k b / d今年年底。去年超过562 k b / d,但预计雪佛龙把它过去的822 k b / d到2022年。活跃在俄罗斯里海领域表达2哈萨克语块在里海的兴趣。该公司还参与两个关节俄罗斯和哈萨克斯坦里海之间的项目,但立法的缺陷导致了多年延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号