...
首页> 外文期刊>Asian oil and Gas >BHP's second strike in Sindh
【24h】

BHP's second strike in Sindh

机译:必和必拓在信德省的第二次罢工

获取原文
获取原文并翻译 | 示例
           

摘要

Operator BHP Billiton confirmed more commercial gas from its Zamzama gas field in Sindh Province,southern Pakistan.Zamzama East,drilled to a depth of 4051m,encountered a 36.3m net gas bearing Pab sandstone within a 61.3m gross gas column,flowing at 40mmscf/d of gas.This is the second successful appraisal well the company has drilled on the field since phase one of the development was completed in June 2003.The initial well,Zamzama North,confirmed a 127m gross gas column with 79m of net pay and flowed at 41mmscf/d.
机译:运营商必和必拓(BHP Billiton)证实,其巴基斯坦南部信德省Zamzama气田有更多商业天然气。ZamzamaEast钻探至4051m的深度,在61.3m总气柱内遇到了含36.3m含Pab砂岩的净气,流量为40mmscf /这是该公司自2003年6月第一期开发完成以来在该油田第二口成功的评价井。第一口油井,Zamzama North,确认了1.27亿总气柱,净采油量为79m并已开始流动。在41mmscf / d。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号