AWARD WINNING CONSTRUCTION AT CURRAGH NORTH COAL MINE

机译:库拉格北部煤矿的获奖建筑

获取原文
获取原文并翻译 | 示例
           

摘要

Collaboration between Thiess and Broons Hire has resulted in the development of a major innovation for levee construction and has contributed to the Curragh North Project receiving a High Commendation at the 2006 Engineering Excellence Awards. Wesfarmers Curragh awarded Parsons Brinckerhoff and Thiess the design and construct civil infrastructure works at the Curragh North Project in October 2004. Located 20 km north of Wesfarmers' existing Curragh mine in Queensland's Bowen Basin, near Blackwater, the Project has received industry recognition for civil works undertaken, in particular the construction of an extensive 22 km levee bank adjacent to the Mackenzie River. With an average height of approximately 5 m and a maximum height of 18 m, the levee bank took nearly 6 months to construct and materials used were locally sourced fine-grained alluvial soils. Central to the construction success was the implementation of a major innovation which involved the use of non-circular impact rollers in compact the levee to engineered fill standards.
机译:Thiess和Broons Hire之间的合作促成了堤防建设的一项重大创新,并为Curragh North项目做出了贡献,并在2006年工程卓越奖中获得了高度赞扬。 Wesfarmers Curragh于2004年10月授予了Parsons Brinckerhoff和Thiess在Curragh North项目的设计和建造民用基础设施工程。该项目位于Wesfarmers现有的Curragh矿以北20公里,位于昆士兰州Bowen盆地,黑水附近,该项目获得了土建工程行业的认可尤其是在Mackenzie河附近修建了一个22公里的堤岸。堤防堤的平均高度约为5 m,最大高度为18 m,耗时近6个月来建造,所用材料均为本地采购的细粒冲积土。施工成功的关键是实施一项重大创新,其中涉及使用非圆形冲击压路机,将堤坝压实到工程填充标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号