首页> 外文期刊>Australian Geomechanics >GEOTECHNICAL DESIGN OF MAIN CREEK TAILINGS DAM
【24h】

GEOTECHNICAL DESIGN OF MAIN CREEK TAILINGS DAM

机译:大堤尾坝的岩土工程设计

获取原文
获取原文并翻译 | 示例
           

摘要

The Main Creek Tailings Dam at Grange Resources Savage River Mine, is a good example of a large tailings dam being constructed using the upstream construction method. The Main Creek Tailings Dam (MCTD) is located at Grange Resources Ltd's (Grange) Savage River Mine in northwest Tasmania. MCTD is based on a zoned earth and rock fill embankment constructed between 1982 & 1985 from waste clay and rock materials from mine development operations. The dam is a valley storage, constructed on the upper reaches of Main Creek, a tributary of the Savage River, to the east of the mine processing mill and south of the original "Old Tailings Dam" (OTD) as shown in Figure 1.
机译:Grange Resources Savage河矿的Main Creek尾矿坝是使用上游施工方法建造大型尾矿坝的一个很好的例子。 Main Creek尾矿坝(MCTD)位于塔斯马尼亚岛西北部的田庄资源有限公司(Grange)萨维奇河矿山。 MCTD基于1982年至1985年之间由矿山开发作业产生的废粘土和岩石材料建造的带区土石料路堤。该大坝是一个山谷储物库,建在萨维奇河的支流Main Creek上游,在选矿厂的东部和原始“老尾矿坝”(OTD)的南部,如图1所示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号