首页> 外文期刊>Australian Geomechanics >GEOTECHNICAL INVESTIGATIONS FOR THE PENSTOCK PLUG OF THE ANTHONY UNDERGROUND POWER STATION, TASMANIA
【24h】

GEOTECHNICAL INVESTIGATIONS FOR THE PENSTOCK PLUG OF THE ANTHONY UNDERGROUND POWER STATION, TASMANIA

机译:塔斯马尼亚州ANTANTY地下电站的五花肉桩的岩土工程研究

获取原文
获取原文并翻译 | 示例
           

摘要

From a reservoir on the Anthony River water flows through a headrace tunnel and a short power tunnel to the Anthony Power Station. The last section of the power tunnel into the underground power station chamber is lined with a concrete backfilled steel penstock. This backfilled steel penstock forms a plug to prevent high pressure water in the unlined power tunnel from penetrating into the power station. This paper describes the investigations that were carried out to determine the length of penstock required and to confirm the water tightness of the finally adopted design for the penstock plug.
机译:水从安东尼河上的水库流经头水道隧道和一条短的电力隧道,到达安东尼电站。进入地下电站室内的电力隧道的最后部分衬有混凝土回填钢管。这种回填的钢制压力管道形成了一个塞子,以防止未衬砌的电力隧道中的高压水渗入电站。本文介绍了为确定所需压力管道的长度并确定最终采用的压力管道塞设计的水密性而进行的调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号