USE OF STONE COLUMNS AS GROUND IMPROVEMENT BENEATH A BRIDGE AND EMBANKMENT -- A CASE STUDY

机译:使用石柱作为桥梁和路堤下的地面改建-案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a case study on the use of stone columns as ground improvement beneath a bridge and embankment. The bridge is located on reclaimed land, adjacent to the Swan River foreshore. Abutments and piers of other highway bridges in the area have traditionally been supported on piles. However, significant differential settlement has occurred between the bridges and the non-piled embankments. By using stone columns it is possible to vary the stiffness of the ground response and thus minimise differential settlements. The paper discusses the procedure used to derive in situ ground stiffness parameters, and the relation of these parameters to the current practice of stone column design. The issues of backfill selection, installation procedure and acceptance testing are also discussed, as are the results of ongoing settlement monitoring of the bridge.
机译:本文以使用石柱作为桥梁和路堤下方的地面改良材料为例。这座桥位于填海之地,毗邻天鹅河的前岸。传统上,该地区其他公路桥梁的桥台和桥墩都由桩支撑。但是,桥梁和非桩基路堤之间已经发生了明显的差异沉降。通过使用石柱,可以改变地面响应的刚度,从而最小化差异沉降。本文讨论了用于导出现场地基刚度参数的程序,以及这些参数与石柱设计的当前实践之间的关系。还讨论了回填的选择,安装程序和验收测试的问题,以及正在进行的桥梁沉降监测的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号