首页> 外文期刊>Building Engineer >APPRECIATION OF RISKS IN SPECIFYING AND DESIGNING CONCRETE STRUCTURES
【24h】

APPRECIATION OF RISKS IN SPECIFYING AND DESIGNING CONCRETE STRUCTURES

机译:规范和设计混凝土结构的风险评估

获取原文
获取原文并翻译 | 示例
           

摘要

Engineers are expected to collaborate with other disciplines so that a building is constructed safely, economically and with due regard to its performance during its expected life. It is essential, therefore, that the design assumptions are justifiable for the assembly of all products and for achieving safety and serviceability of the building. Simultaneously, it is essential to eliminate or reduce any potential hazards and provide information on issues that are likely to present residual hazards, including measures essential for long-term performance of the assembly of products. This information is used by the contractor for the construction stage and included in the Health and Safety File, a part of the hand-over documentation, for the benefit of those responsible for post-construction maintenance. CDM Regulations have a structured procedure to achieve these objectives, which are not different in principle to those expected from professional engineers as a part of their ethical duties.
机译:工程师应与其他学科合作,以便安全,经济地建造建筑物,并适当考虑其在预期使用寿命内的性能。因此,对于所有产品的组装以及实现建筑物的安全性和可维修性,设计假设是合理的。同时,必须消除或减少任何潜在危害,并提供有关可能带来残留危害的问题的信息,包括对产品组装的长期性能至关重要的措施。承包商在施工阶段使用此信息,并将其包含在移交文档的一部分“健康和安全文件”中,以使负责施工后维护的人员受益。 CDM法规具有实现这些目标的结构化程序,其原则上与职业工程师作为其道德职责的一部分所期望的没有区别。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号