Summary of Decision and Reasons

机译:决策和原因摘要

获取原文
获取原文并翻译 | 示例
           

摘要

This matter was heard before a panel of the Discipline Committee on October 15, 2003, at the Association of Professional Engineers of Ontario (the "association") in Toronto. The association was represented by John Abdo of Cassels Brock and Engineer A was unrepresented. In a Notice of Hearing dated January 14, 2003, it was alleged that Engineer A was guilty of professional misconduct as defined in Regulation 941 and that he was incompetent. The Agreed Statement of Facts, dated September 26, 2003, is summarized as follows: On or about March 16, 2001, Engineer A signed a General Review/Commitment Certificate ("GRCC") and a letter of undertaking in relation to the construction of an industrial/commercial building.
机译:2003年10月15日,在多伦多的安大略省专业工程师协会(以下简称“协会”)的纪律委员会的一个小组进行了听证。该协会由Cassels Brock的John Abdo代表,而工程师A则没有代表。在2003年1月14日的“听证会通知”中,据称工程师A犯有《条例》第941条所定义的专业不当行为,并且无能为力。于2003年9月26日签署的《事实说明书》摘要如下:2001年3月16日左右,工程师A签署了一份有关通用电气的建造/建造的总体审查/承诺证书(GRCC)和承诺书。工业/商业建筑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号