...
首页> 外文期刊>Canadian Journal of Civil Engineering >Utility impact rating with subsurface utility engineering in project development
【24h】

Utility impact rating with subsurface utility engineering in project development

机译:项目开发中地下公用工程的公用事业影响等级

获取原文
获取原文并翻译 | 示例
           

摘要

A lack of reliable information regarding the locations of underground utilities can not only result in property damage, construction delays, design changes, claims, injuries, and even deaths but can also cause traffic delays, local business disruptions, environmental problems, and utility service breakdowns in highway projects. The subsurface utility engineering (SUE) is an engineering process designed to reduce the potential of underground utility conflicts at the planning phase. The SUE uses new and existing technologies to identify, characterize, and map accurately the underground utilities with three major activities: designation, location, and data management. In this study, a decision-support tool called the SUE utility impact rating form, which refers to utility complexity at the construction site, has been developed to determine which projects should include SUE and the appropriate levels of SUE investigation to be used. In addition, case studies with benefit-cost ratio have been performed to verify the form.
机译:缺乏有关地下公用设施位置的可靠信息,不仅会导致财产损失,施工延误,设计变更,索赔,受伤甚至死亡,还可能导致交通延误,当地业务中断,环境问题以及公用事业服务崩溃在公路项目中。地下公用工程(SUE)是一种工程过程,旨在减少规划阶段地下公用设施冲突的可能性。 SUE使用新的和现有的技术通过以下三个主要活动来准确地识别,表征和绘制地下公用设施:标志,位置和数据管理。在这项研究中,开发了一种决策支持工具,称为SUE公用事业影响评价表,该表涉及建筑工地的公用事业复杂性,以确定哪些项目应包括SUE以及要使用的SUE调查的适当水平。此外,还进行了具有成本效益比的案例研究以验证表格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号