首页> 外文期刊>Materials Management & Distribution: Canada s Supply Chain Magazine >Building design-Part One: Wrapping the building around the materials handling solutions
【24h】

Building design-Part One: Wrapping the building around the materials handling solutions

机译:建筑设计-第一部分:将建筑物包装在物料搬运解决方案周围

获取原文
获取原文并翻译 | 示例
           

摘要

In previous columns I've described initial steps that need to be taken in the early design stages of a retail DC construction project. Now it's time for the physical construction of the building. I cannot emphasize enough the importance of working closely with the full team of designers and builders, but don't let them take over the project. They will focus on cutting costs and staying on budget, regardless of any business reasons you have for asking for modifications to improve storage and throughput capacity, operational safety or building efficiency.
机译:在先前的专栏中,我描述了零售DC建设项目的早期设计阶段需要采取的初始步骤。现在该进行建筑物的物理构造了。我不能强调与整个设计师和建造者团队紧密合作的重要性,但不要让他们接手该项目。无论您出于修改存储和吞吐能力,提高操作安全性或提高建筑效率的任何商业原因,他们都会专注于削减成本并保持预算不变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号