...
首页> 外文期刊>Meiden Review: International Edition >Recent Construction Work - Construction of a Hydroelectric Power Station
【24h】

Recent Construction Work - Construction of a Hydroelectric Power Station

机译:最近的建设工作-水力发电站的建设

获取原文
获取原文并翻译 | 示例
           

摘要

Hydroelectric power plants are operated around the world to produce clean energy that contributes to the prevention of global warming. Drawing on long-term know-hows relating to rotating machineries and hydroelectric power generation, Meidensha Corporation has delivered many hydro turbine generators to Japanese and overseas customers. These generators are still being operated today. For structural reasons of the generating system, this time a vertical Francis type turbine and generator delivered to the Nogawa No.2 Power Station had to be installed one by one starting from the lowest section while coordinating with the civil engineering work for the structural facilities of the power station. This construction work accompanies the installation of a variety of ancillary facilities such as power transmission and receiving equipment and remote supervision equipment for the hydroelectric power station. Therefore, the overall construction period was very long. In order to realize the successful delivery of this plant without accidents on the client side, high-quality safety and quality control was required for the plant.
机译:世界各地都有水力发电厂在运营,以产生清洁能源,从而有助于防止全球变暖。 Meidensha Corporation利用与旋转机械和水力发电相关的长期专业知识,为日本和海外客户提供了许多水轮发电机。这些发电机今天仍在运行。由于发电系统的结构原因,这次必须从最低处开始逐一安装交付给野川第二电站的立式弗朗西斯式涡轮机和发电机,同时协调土木工程的结构设施。发电站。这项建设工作伴随着各种辅助设施的安装,例如水电站的电力发送和接收设备以及远程监控设备。因此,整个建设周期很长。为了实现该工厂的成功交付而不会在客户端发生意外,工厂需要高质量的安全和质量控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号