...
首页> 外文期刊>Midstream monitor >NET Midstream Completes NET Mexico Pipeline Ahead Of Schedule
【24h】

NET Midstream Completes NET Mexico Pipeline Ahead Of Schedule

机译:NET Midstream提前完成NET墨西哥管道

获取原文
获取原文并翻译 | 示例
           

摘要

NET Midstream’s affiliate, NET Mexico Pipeline Partners LLC, completed construction of its 120-mile, 42-inch and 48-inch Texas intrastate pipeline ahead of its initial expected in-service date of Dec. 1. Mechanical completion of the pipeline, which delivers natural gas to Mexico, occurred in October. The pipeline has finished commissioning activities and is now fully operational. NET Mexico’s design capacity is 2.3 billion cubic feet per day (Bcf/d), which can be expanded to 3 Bcf/d with additional compression. NET Mexico will begin operations with 50,000 horsepower (hp) of compression, with plans to increase to 114,000 hp in late 2015. The pipeline is anchored by a long-term firm transportation agreement, for up to 2.1 Bcf/d, with MexGas Supply Ltd., a subsidiary of Mexico’s state-owned gas company Petróleos Mexicanos, or Pemex.
机译:NET Midstream的关联公司NET Mexico Pipeline Partners LLC在其最初的预计12月1日启用日期之前完成了其120英里,42英寸和48英寸德克萨斯州州内管道的建设。墨西哥的天然气发生在十月份。该管道已完成调试活动,现已全面运行。 NET Mexico的设计产能为每天23亿立方英尺(Bcf / d),可以通过附加压缩扩展到3 Bcf / d。 NET墨西哥公司将以50,000马力的压缩力开始运营,并计划在2015年末增加到114,000 hp。该管道是根据与MexGas Supply Ltd签订的高达2.1 Bcf / d的长期牢固运输协议确定的是墨西哥国有天然气公司PetróleosMexicanos或Pemex的子公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号