...
首页> 外文期刊>Mining Engineering >How to deal with blocked chutes in mining applications
【24h】

How to deal with blocked chutes in mining applications

机译:如何处理采矿应用中的滑槽

获取原文
获取原文并翻译 | 示例
           

摘要

A relatively new and large export thermal coal mine, located in the Hunter Valley region of Australia, produces in excess of 9.1 Mt/a (10 million stpy).This coal handling preparation plant (CHHP) was experiencing problems in production because of intermittent tripping of conveyors caused by the blocked chute switches in the head conveyor transfer chutes.These transfer chutes are critical to the CHPP plant, as all new coal feed enters through the chutes and conveyors.
机译:位于澳大利亚猎人谷地区的一个相对较新的大型出口热能煤矿,年产量超过9.1吨/年(1000万stpy)。由于间歇性跳闸,该选煤厂(CHHP)在生产中遇到问题由于所有进煤都通过溜槽和输送机进入,这些输送溜槽对于CHPP工厂至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号