Design, build and PPP program delivery practices are not used on large tunnel projects in Austria

机译:奥地利的大型隧道项目不使用设计,建造和PPP程序交付实践

获取原文
获取原文并翻译 | 示例
           

摘要

In North America and the rest of the world, it is now in vogue to promote the use of design build and public private partnership (PPP) for major tunnel projects, as there is the perception that these project delivery methods can deliver a completed tunnel project faster and at a lower cost to the owner than conventional project delivery methods. There is a debate ongoing within the tunnel industry if this is true or just a passing fad promoted by individuals and/or companies to project owners as a means for them to get a project without expending political capital or having to secure financing in advance; and pushing the risk to stakeholders other than themselves.
机译:在北美和世界其他地区,由于人们认为这些项目交付方法可以交付完整的隧道项目,因此现在正在推广在大型隧道项目中使用设计构建和公私合营(PPP)与传统的项目交付方法相比,速度更快,所有者的成本更低。隧道行业内是否存在这种争论是真的,还是个人和/或公司向项目所有者提倡的一种过时的风尚,以此作为他们获得项目而无需花费政治资本或不必预先获得融资的手段;并将风险推给其他利益相关者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号