首页> 外文期刊>Mining Engineering >BHP Billiton plans 564-million dollars iron ore expansion project
【24h】

BHP Billiton plans 564-million dollars iron ore expansion project

机译:必和必拓计划投资5.64亿美元扩建铁矿石项目

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Billiton plans to spend 564 million US dollars to expand its iron ore operations in Western Australia. The company also said that South Korea's Pohang Iron and Steel will be a partner in the initial development and will be a major customer. The expansion will take in the Pilbara region. It includes developing the new Mining Area C Mine (MAC). The 213-million US dollars mine will have a capacity of 15 Mt/a (16.5 million stpy) of Marra Mamba-type lump and fines ore by 2011. The MAC Mine's current resource is 890 Mt (981 million st) of iron ore. The initial development will be based on the C deposit. This deposit has a proven reserve of 161 Mt (177 million st) and a probable reserve of about 29 Mt (32 million st). In addition to the MAC Mine, development will include a 38-km (23-mile) railroad that will join with the existing railroad at Yandi. Other infrastructure at the mine includes an airstrip, power, water, roads and accommodations for 150 workers (500 during construction).
机译:必和必拓计划斥资5.64亿美元扩大其在西澳大利亚州的铁矿石业务。该公司还表示,韩国浦项钢铁将成为初期开发的合作伙伴,并将成为主要客户。扩张将在皮尔巴拉地区进行。它包括开发新的C区矿山(MAC)。到2011年,这座价值2.13亿美元的矿山的Marra Mamba型块矿和粉矿的产能将达到15 Mt / a(1650万stpy)。MAC矿山目前的铁矿石资源为890 Mt(9.81亿st)。初步开发将基于碳矿床。该矿床的探明储量为161 Mt(1.77亿st),可能的储量约为29 Mt(3200万st)。除MAC矿山外,开发项目还将包括一条38公里(23英里)的铁路,该铁路将与Yandi的现有铁路连接。矿山的其他基础设施包括飞机跑道,电力,水,道路和可容纳150名工人的住房(施工期间为500名)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号