【24h】

ROMPs in Dorset

机译:多塞特郡的ROMP

获取原文
获取原文并翻译 | 示例
           

摘要

In November Dorset CC considered the consultation on proposals from ODPM for the introduction of a new legal power to bring forward the date for the first periodic review of old mineral permissions (see Mineral Planning 101 p.30). Dorset CC welcomed the proposals as a necessary measure to ensure completion of outstanding ROMP applications. In Dorset, 30 older sites were originally identified as requiring initial review under the ROMP procedure; valid applications for review had been received for 26 sites. Dorset CC had determined reviews for 11 of the 26 initial review sites for which applications were made and the applications in relation to California Quarry and Norden Mine had been withdrawn. There are currently reviews outstanding in respect of 12 sites. A further site (Warmwell Airfield) is subject to a review in which discussions are continuing in relation to the nature of previous agreements over the extent of working.
机译:11月,多塞特郡委员会审议了关于ODPM提案的咨询,该提案采用了新的法律权力,以提出对旧矿产许可进行首次定期审核的日期(请参见《矿产计划》 101第30页)。 Dorset CC欢迎这些建议,认为这是确保完成出色的ROMP应用程序的必要措施。在多塞特郡,最初确定了30个较旧的站点,需要根据ROMP程序进行初步审核;已收到26个站点的有效审查申请。 Dorset CC已确定了26个初始审核站点中的11个审核站点,已针对这些站点进行了申请,并且与加利福尼亚采石场和Norden矿有关的申请已被撤回。目前有12个站点的未完成评论。另一个站点(沃姆韦尔机场)将接受审核,在此范围内,关于先前协议在工作范围内的性质的讨论仍在继续。

著录项

  • 来源
    《Mineral Planning》 |2005年第102期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号