...
首页> 外文期刊>Mineral Planning >Lafarge stop-gap permission
【24h】

Lafarge stop-gap permission

机译:拉法基权宜之计

获取原文
获取原文并翻译 | 示例
           

摘要

Proposals by Lafarge Aggregates Ltd for extraction of sand and gravel at Syston were permitted by Leicestershire CC in August.It was proposed to extract 190,000t of sand and gravel in up to 15 months from 12ha application area at Fosse Way and transport it for processing at the Wanlip Road site. The extraction area would be reinstated to original ground levels with overburden and imported inert wastes and returned to agricultural use. Restoration would take 2.5 years from the completion of extraction.
机译:Lafarge Aggregates Ltd在8月获得莱斯特郡CC批准的在Syston提取砂砾的建议。建议在15个月内从Fosse Way的12公顷施用区域中提取190,000吨砂砾并运输至万里路遗址。开采面积将恢复到原来的地面水平,其中有覆盖层和进口的惰性废物,并返回农业用途。从提取完成到恢复需要2.5年。

著录项

  • 来源
    《Mineral Planning》 |2001年第89期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号