...
首页> 外文期刊>Mineral Planning >Revised Norfolk proposal approved
【24h】

Revised Norfolk proposal approved

机译:修订的诺福克提案获得批准

获取原文
获取原文并翻译 | 示例
           

摘要

A revised application by Barker Bros Aggregates on land adjoining Swanton Morley Airfield was considered by Norfolk CC in June. This followed a previous refusal (see Mineral Planning 91 p.47). Member views were again requested, and permission was authorised. The proposal involved extraction and continued processing of 450,000t of sand and gravel at 160,000 tpa from a 12.5 ha site until June 2007. The revised application was an improvement and there was no reason why the impacts of extraction, particularly relating to visual intrusion, noise and loss of amenity, could not be controlled to acceptable levels through the imposition of conditions. The two key issues concerning local residents remained impact of the new extraction area and continued use of the existing plant.
机译:诺福克CC于6月考虑了Barker Bros骨料公司在与Swanton Morley机场相邻的土地上提出的修订申请。这是在先前的拒绝之后(请参阅《矿物规划》 91页第47页)。再次要求成员发表意见,并获得许可。该提案涉及从12.5公顷的土地中提取并继续处理160,000吨/年的450,000吨砂石,直到2007年6月。修订后的申请是一项改进,没有理由说明提取的影响,特别是与视觉入侵,噪音有关的原因。和舒适度的丧失,不能通过施加条件控制在可接受的水平。与当地居民有关的两个关键问题仍然是新采掘区的影响以及现有工厂的继续使用。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号