首页> 外文期刊>Sea Technology: Worldwide Information Leader for Marine Business, Science & Engineering >Calegeo Turns Around Integrated Survey Reports Less Than Two Weeks After Vessel Mobilization
【24h】

Calegeo Turns Around Integrated Survey Reports Less Than Two Weeks After Vessel Mobilization

机译:Calegeo在动员不到两周后就完成了综合调查报告

获取原文
获取原文并翻译 | 示例
       

摘要

Calegeo (Buxton, England) has completed two full site investigation surveys, including 2D high-resolution and boreholes, offshore Congo from its vessel Highland Spirit. The assessment was issued within three days, followed by the first draft of the site survey report six days after the start of survey operations.
机译:Calegeo(英格兰布克顿)已经完成了两次全现场调查,包括从其Highland Spirit船在刚果海上进行的2D高分辨率和钻孔。评估是在三天之内发布的,随后是在调查活动开始六天后发布的现场调查报告的初稿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号